 |
 |
 |
|
 |
 |
The Tooling Engineering Group coordinates Advanced Product Quality Planning activities. |
 |
 |
 |
 |
|
- Every new product is assigned a tooling engineer for the life of the program, ensuring continuous and frequent dialogue between Walker Die Casting and their customers to ensure that project goals are met.
- Die design supervised by a senior tooling engineer with over 30 years experience
- Validation of casting quality (metallurgical and dimensional), productivity (cycle time) and tool function performed by APQP team
|
|